COLONEL  FAREWELL  PUBLIC  SCHOOL  ADDITION
WHITBY,  ONTARIO

Now under construction, this  two storey addition will contain 11 classrooms, a library resource centre, teacher's work room, seminar room, storage, two handicap washrooms, boy's and girl's washrooms, an elevator and a mechanical room. The project involved 1,831 m2 (19,700 sq.ft.) of new space and the renovation of a further 165 m2 (1,780 sq.ft.) of the existing building. Estimated cost is $3,118,800. Tendered price was $2,865,000.

Colonel Farewell 01 Site.jpg (139892 bytes)
SITE  PLAN
Colonel Farewell 02 Main.jpg (128636 bytes)
MAIN  FLOOR  PLAN
Colonel Farewell 03 Second.jpg (84945 bytes)
SECOND  FLOOR  PLAN
Subconsultants

Mechanical Ellard-Willson Engineering
Electrical Ellard-Willson Engineering
Structural Richard Dray Engineering

Description

This is a new 2-storey, 11 classroom and library addition to a 1-storey core building. The original school was designed by our firm in 1982. The current student enrollment has grown to 580 students. Although the school is adjacent to a park, it has limited flat land. The L-shaped plan with a 2-storey building was designed to minimize re-grading for an expanded building imprint. Site improvements to storm water drainage ameliorated the play area around the building.

Addition will be used for grades 7 and 8.

Technical Specifications

Building system consists of load bearing masonry, cavity wall construction, coreslab floors and roofs, and slab-on-grade first floor, built-up roofing, standard V.T. and paint finishes in classrooms, board standard fitments, elevator, 2 staircases.
Library Resource Centre is air conditioned.
Handicap washrooms and washroom on 2nd floor.

Energy Management

Mechanical room provided for new air supply on 2nd floor.
High performance glazing reduces energy loads for air conditioning.

Information Technology

All classrooms designed to include I.T. cabling.

Special Conditions

Scheduling and building access during construction are key issues in the design of this school.