ZEBROSKI  ASSOCIATES  LTD

ARCHITECT



HOME

BANQUET   CENTERS
CASINOS
CUSTOM  RESIDENCE
MULTIPLE RESIDENTIAL
COMMERCIAL
INSTITUTIONAL
INDUSTRIAL
CARIBBEAN  PROJECTS
PLANNING

WHAT'S  NEW
LINKS
GARY W. ZEBROSKI

e-mail  
gary@zebroski.com

telephone
905-575-9333


Ontario Association of Architects




Architectural Institute of           British Columbia


Royal Architectural Institute of Canada

 

 

 

 

 

INDUSTRIAL  PROJECTS
SPEED  SYSTEM
Cambridge, Ontario, Canada: 
From NW.jpg (53832 bytes)
VIEW  FROM  ROAD
Entry.jpg (151589 bytes)
ENTRY
          

This new building will be dedicated to production of orthodontic devices and implants; primarily for export. With energy conservation as a prime requirement, the building consists of 1,850 m2 (20,000 sq.ft.) of ground floor production space and 1,100 m2 (12,000 sq.ft.) of second floor space which contains offices, engineering and board rooms as well as employee spaces such as a cafeteria. The second level is set back on three sides and a 'green roof' utilized to allow employees both view and access to the grassed and planted roof. A combination of windows and shades will allow natural light into the building but also prevent solar gain in summer.

Elev E.jpg (66547 bytes)
VIEW  FROM   NEIGHBOUR (EAST)
Elev N.jpg (58467 bytes)
VIEW  FROM  STREET (NORTH)
Elev W.jpg (37442 bytes)
VIEW  FROM  PARKING  &  LANE   (WEST)