|
HOME
BANQUET
CENTERS
CASINOS
CUSTOM RESIDENCE
MULTIPLE
RESIDENTIAL
COMMERCIAL
INSTITUTIONAL
INDUSTRIAL
CARIBBEAN PROJECTS
PLANNING
WHAT'S
NEW
LINKS
GARY W. ZEBROSKI
e-mail
gary@zebroski.com
telephone
905-575-9333

Ontario Association of Architects

Architectural Institute of
British Columbia

Royal Architectural Institute of Canada
| |
 |
INDUSTRIAL PROJECTS
HOSTESS FRITO-LAY
Ancaster, Ontario, Canada |
|
Located on a 7 acre (3 ha) site, this 31,000 sq.ft. (2,900
m2) pre-engineered building acts as the company's distribution center for all of
this part of Ontario. Located on the prime corner of an up-scale industrial
park, the project makes heavy use of earth berms and landscape materials to
soften the impact of the large warehouse section from Highway #2 which is a very
busy regional road. |

SITE
PLAN |

OFFICE FLOOR
PLAN |

CONCEPT PERSPECTIVES |
|
The products arrive by large tractor-trailer which are unloaded at 6 docks
located at the east end of the building. There is also room to park an
additional 15 trailers awaiting unloading. The products are stationed in the
28,000 sq.ft. (2,600 m2) warehouse before being loaded into smaller trucks at
the 14 smaller loading bays on the south face. |
|
Inside the office area is contained all of the administrative, purchasing and
sales offices as well as employee spaces and 2 conference/training rooms. |

CONFERENCE ROOMS |

TYPICAL OFFICE |

WAREHOUSE-EMPTY |

WAREHOUSE-FULL |

LOADING AREA |
|